RERA-Registered as ACE Arte · Sector 150, Noida Expressway Sales desk · +91 98114 05300
Tree-lined residential boulevard at dusk in Sector 150, Noida

Three of the six payment triggers are poured in concrete. You can go and look at them.

Representative lifestyle imagery

ACE Parkway 2.0 · Sector 150 Noida · Payment Plan 20X5

ACE Arte Payment Plan 20X5 | Every Milestone Decoded

The price list ACE circulated for ACE Arte, the RERA-registered name for ACE Parkway 2.0 in Sector 150 on the Noida Expressway, prints the payment plan as "20X5": six lines that take a booking from 10% to the keys. This page takes each line in turn and says what the trigger actually is. Our sales desk is an independent UP-RERA registered channel partner (UPRERAAGT000309/01/2026), not the developer.

Quick answer

ACE Arte's printed plan is 20X5, five blocks of 20%: 10% on booking and 10% within 30 days, then 20% after ground-floor slab casting, 20% after 10th-floor slab casting, 20% on completion of the super structure, and 20% plus other charges on the offer of possession. As printed on the price list W.E.F. 21-08-2026, read by the desk 3 September 2026.

What does the 20X5 plan print, line by line?

The name is the structure: five blocks of 20% of the base sale price, with the first block split into two payments of 10%. Here is the printed ladder, with what each trigger is made of:

Line Trigger (as printed) Share What kind of trigger it is
1On booking10%Your decision, no construction involved.
2Within 30 days10%The plan's only calendar trigger. It runs whether or not anything is built.
3After slab casting of the ground floor20%Observable. The first concrete slab of your tower, poured at ground level.
4After slab casting of the 10th floor20%Observable. The tower's frame has climbed ten floors.
5On completion of super structure20%Observable. The frame has topped out; finishing work remains.
6On offer of possession20% + other chargesA legal letter, not a site condition, and it opens the other-charges bill.

Transcribed from the developer's price list W.E.F. 21-08-2026, read 3 September 2026. The plan is the developer's and can be revised; the schedule that binds is the one in your Agreement for Sale. This is a transcription and a reading aid, not an offer.

Which milestones can you check with your own eyes?

Lines 3, 4 and 5. A slab casting is not a paperwork event. The ground-floor slab of a named tower either exists or it does not, and the same goes for the 10th-floor slab and a topped-out frame. That is the practical virtue of a construction-linked plan: before releasing an instalment, you can ask which tower and which stage the demand letter refers to, and go look. The register separately records construction proposed to start 15 August 2026 and completion declared 15 February 2031, as our register mirror read the entry on 29 July 2026. The full record is on our ACE Arte RERA record page.

Lines 1 and 2 are the opposite: nothing on site triggers them. And line 6 is a letter: "offer of possession" is a legal act by the developer, typically after the occupancy paperwork, not something visible from the road.

How much moves before the first slab?

Twenty per cent of the base sale price (10% on booking plus 10% within 30 days) falls due before line 3 can even exist. On the timeline, that is the plan's honest asymmetry: the first fifth of the money is calendar-money, the middle three-fifths follow the concrete, and the last fifth waits on the possession letter.

The early money is also the money most exposed to a wrong payment instruction, because it moves fastest and earliest. Where it must go (the printed collection account, the cheque-favour wording, and the never-pay-an-individual rule) is set out on our ACE Arte EOI process page, and the three-account structure behind it on the RERA bank accounts page.

What does "offer of possession" trigger besides the last 20%?

The bill for everything the base rate never covered. The plan's own wording on line 6 is "20% plus other charges", and the price list names PLC, GST and other charges as extra without printing a rupee figure for any of them, while stamp duty and statutory charges are borne by the buyer. So the offer-of-possession demand is the first document in the sequence where those named heads turn into amounts.

The practical move is to get ahead of it: ask the desk for the itemised charge heads in writing at booking stage, so the closing demand is a reconciliation rather than a surprise. The rate those charges sit on top of is on our ACE Arte price list page, transcribed from the same document as this plan.

Is 20X5 construction-linked or time-linked?

Both, in sequence. It opens time-linked (booking plus 30 days), runs construction-linked through the frame, and closes on a legal trigger. That is worth knowing because "construction-linked plan" is often used as if every instalment waited on progress. Here, the first 20% does not. If you are comparing plans across projects, compare where the non-construction money sits, not just the percentages. Our broader explainer on how milestone wording binds is on the ACE Arte payment plan page.

How to get the dated written schedule

Ask for the 20X5 schedule for your unit. Our sales desk sends the printed plan and the dated written instalment schedule for your configuration, tower and floor, the version worth acting on.

Get the 20X5 schedule

  1. WhatsApp: Message +91 98114 05300 with your preferred configuration.
  2. Call: +91 98114 05300 to walk the six lines through with a consultant.
  3. Enquiry form: Request a preview and a consultant responds within one business day.

You buy directly from ACE Group, in your own name, with all payments to the developer's designated account. Our sales desk is an authorised channel partner paid by ACE Group, so there is no extra cost to you either way, and this is not ACE Group's official website.

Key points

  • 20X5 means five blocks of 20%: 10% on booking, 10% within 30 days, 20% after ground-floor slab casting, 20% after 10th-floor slab casting, 20% on completion of the super structure, 20% plus other charges on the offer of possession.
  • Lines 3 to 5 are observable construction events. You can visit the site and see whether the slab or the topped-out frame exists before releasing the instalment.
  • 20% of the base sale price moves in the first 30 days, before any construction-linked line, the money most exposed to a wrong payment instruction.
  • "Offer of possession" is a legal letter, and its printed wording, "20% plus other charges", opens the bill for the charge heads the list names without figures.
  • The plan is printed on the price list W.E.F. 21-08-2026 and can be revised; the schedule that binds is the one in your Agreement for Sale.

Frequently Asked Questions

What are the six lines of the ACE Arte 20X5 payment plan?

As printed on the price list W.E.F. 21-08-2026: 10% on booking, 10% within 30 days, 20% after slab casting of the ground floor, 20% after slab casting of the 10th floor, 20% on completion of the super structure, and 20% plus other charges on the offer of possession. Five blocks of 20% (the first block split into two 10% payments), which is what the 20X5 name refers to.

Which ACE Arte payment milestones can I verify myself?

The three middle ones. A slab casting is an observable construction event. The ground-floor slab and the 10th-floor slab of your tower either exist or they do not, and completion of the super structure means the frame has topped out. Before releasing those instalments, you can ask which tower the demand refers to and see the stage for yourself. The first two lines (booking and the 30-day payment) are not construction-linked at all, and the last one is a legal letter rather than a site condition.

How much of the ACE Arte price moves before any construction milestone?

Twenty per cent of the base sale price (10% on booking and 10% within 30 days) falls due before the first construction-linked line, the ground-floor slab casting, is reached. That is the money most exposed to a wrong payment instruction, which is why the collection-account details and the never-pay-an-individual rule on our EOI process page matter most at exactly this stage.

What does 'offer of possession' actually trigger in the ACE Arte plan?

Two things at once. The final 20% of the base sale price falls due, and the plan's own wording, '20% plus other charges', means the other-charges bill opens with it. The price list names PLC, GST and other charges as extra without printing a rupee figure for any of them, and stamp duty and statutory charges are borne by the buyer, so the offer-of-possession demand is the first document where those heads turn into amounts. Ask the desk for the itemised heads in writing before that letter arrives, not after.

ACE Arte ka payment plan kya hai, 20X5 ka matlab kya hota hai?

20X5 matlab paanch hisse, har ek 20% ka. Booking par 10%, 30 din ke andar 10%, ground floor ki slab casting ke baad 20%, 10th floor ki slab casting ke baad 20%, super structure complete hone par 20%, aur possession ke offer par 20% plus other charges, jaise price list W.E.F. 21-08-2026 par chhapa hai. Beech ke teen milestone construction se jude hain, jo aap site par jaakar khud dekh sakte hain. Apne unit ka dated written schedule desk se WhatsApp par maang lijiye.

Want the 20X5 plan and the dated written schedule for your unit?

Get the Schedule on WhatsApp   Call +91 98114 05300

Disclaimer. This website is maintained by Vidastu Advisory (UP-RERA Agent UPRERAAGT000309/01/2026), an independent, authorised channel partner. This is not the official website of ACE Group, and Vidastu does not represent itself as the developer or builder. It is for information purposes only and does not constitute an offer or solicitation. ACE Parkway 2.0 is now RERA-registered as ACE Arte (UP-RERA UPRERAPRJ528653/07/2026) · up-rera.in. The payment plan on this page is transcribed from the developer's price list W.E.F. 21-08-2026 as read on 3 September 2026 and can be revised by the developer; the schedule that binds is the one recorded in the Agreement for Sale. Prospective buyers should independently verify all details and RERA status at up-rera.in before any decision.